✨ NEW · CONFLICT DETECTION FOR YOUR TIMELINES

Stop losing money
on messy quotes.

QuoteKit Pro is the first quoting tool built for how contractors actually work — multi-trade jobs, parallel phases, and timeline conflicts caught before they cost you.

Start 14-day free trialSee pricing →
NO CREDIT CARD · CANCEL ANYTIME · 14-DAY FREE TRIAL
QUOTES
247
SENT
89
WIN RATE
34%
VALUE
$1.2M
Bathroom + Kitchen Reno · Smith Residence
$48,200
● Bathroom · 6 phases● Kitchen · 5 phases⚠ 2 conflicts
THE PROBLEM

Quoting eats your evenings.

Spreadsheets that don't catch conflicts. Templates that overwrite each other. Mental math at 11pm to figure out if the kitchen and bathroom can actually run in parallel.

Then a missed inspection sends a $4,200 mistake walking off the job, and you spend Saturday rewriting the proposal from scratch.

QuoteKit Pro stops that from happening.

HOW IT WORKS

Three things every other tool gets wrong.

01

Multi-template jobs, side by side

Doing a roof + bathroom on the same property? Load both templates into one quote. Each phase keeps its colored origin so you always know what came from where. No copy-paste, no spreadsheet gymnastics.

LOADED TEMPLATES
● Bathroom · 6● Roof · 4
Demolition (Bathroom)
Demolition (Roof)
Rough-In Plumbing
Tile Install
Shingle Install
02

Conflict detection that actually catches stuff

Inspection scheduled before the rough-in completes? Cleanup before install ends? Rough-in after finished walls? QuoteKit flags it before you send the quote. Auto-fix with one click.

2 timeline conflicts detected
1 high · 1 medium
HIGHInspection before rough-in completes
03

Parallel phases, lane-aware timelines

Real jobs aren't strictly sequential. Mark phases as parallel, set custom overlaps in days, and watch the Gantt timeline stack them in lanes. See exactly what runs concurrently — and what crew capacity you'll need.

TIMELINE · 18 DAYS · 3 PARALLEL
Demo
Rough-in
Tile Prep
Install
BUILT FOR REAL CONTRACTORS

From small remodelers to multi-crew firms.

The conflict detection alone has saved me from two scheduling disasters this month.
Solo remodeler · Bathroom & kitchen specialist
Finally a tool that understands we run multiple trades on one job. Spreadsheets can't do this.
GC running a 4-person crew
Cut my quote prep time from 3 hours to 40 minutes. That's it. That's the review.
Contractor in Year 12
* EARLY ACCESS QUOTES · MORE COMING AS WE LAUNCH PUBLICLY
PRICING

Pick a plan that fits.

All plans include the MOAT features. No feature gating on the differentiators.

Starter
$49/mo
For solo contractors getting started.
  • 10 quotes per month
  • All MOAT features
  • Templates library
  • Email support
MOST POPULAR
Pro
$99/mo
The standard for growing operators.
  • Unlimited quotes
  • All MOAT features
  • Custom templates
  • Priority support
Team
$199/mo
For multi-person crews.
  • Everything in Pro
  • Up to 5 team seats
  • Shared templates
  • Dedicated onboarding
See full plan comparison →
FAQ

Common questions.

Do I need a credit card to start?
No. The 14-day trial is free, no card required. We'll only ask if you decide to subscribe at the end.
What happens if I go over my plan's quote limit?
Starter caps at 10 quotes/month. You'll see a friendly upgrade prompt — no surprises, no overage charges. Existing quotes always remain editable.
Can I import quotes from my old tool?
Not yet, but planned. Email us your current setup and we'll prioritize it for your account if you signup before the import tool ships.
Does it work on mobile?
Yes — the entire app is mobile-friendly, including the wizard. Most contractors start a quote on the truck and finish at the desk.
What about my data — is it safe?
All quotes are stored encrypted in Supabase (Postgres). Row-level security means even we can't query other users' data. Standard practice for SaaS.
Can I cancel anytime?
Yes, anytime. No contracts, no fine print. If you cancel mid-month, you keep access until the end of your billing period.

Ready to stop losing weekends?

14 days free. No credit card. Sign up in 30 seconds.

Start free trial →